Related Items:

New!
Dayton Superior D250 S/CA #3/#4 Bar Lock Rebar Coupler

Dayton Superior D250 S/CA #3/#4 Bar Lock Rebar Coupler

Price: CALL

Dayton Superior D250 S/CA #5 Bar Lock Rebar Coupler

Dayton Superior D250 S/CA #5 Bar Lock Rebar Coupler

Price: CALL

Item #: D250XL-EPX-11
Availability: Stock
Usually ships In 2-5 Business Days

Dayton Superior D250XL Extra Long Series Epoxy Bar Lock for #11 Rebar

  • Outside Diameter: 3.1"
  • Length: 24.1"
  • Bolt quantity:18
  • Head Size: .75"
  • Nominal Shear Torque: 415 ft. lbs.
  • Designed to work with Grade 75/80 Rebar
  • Made in USA
  • Approvals: Caltrans, Army Corp of Engineers, State DOT's, AASHTO, City of Los Angeles, Ministries of Transportation Canada
Price: CALL

    Quantity:
    Image result for dayton superior
    The D250XL Bar Lock XL-Series Coupler is a Type 2, rebar coupler used to connect two pieces of rebar. It consists of a thick walled tube, specially designed lock shear bolts, serrated grip rails, and a center stop pin. The D250XL is made from USA melted and rolled steel.
    The D250XL Bar Lock XL-Series Coupler is used to provide a continuous path of mechanical reinforcing from two pieces of the same diameter rebar.

    Clink link below for Product Data

    d250xlbarlock_tds.pdf

    INSTALLATION

    1. Insert the end of the first rebar halfway into the coupler until it contacts the center stop pin.

    2. Holding the first rebar in place, tighten all the bolts on that half until they are hand tight against the rebar.

    3. Insert the end of the second rebar halfway into the coupler until it contacts the center stop pin.

    4. Holding the second rebar in place, tighten all the bolts on that half until they are hand tight against the rebar.

    5. In a random alternating pattern, tighten all bolts to approximately 50% of the specified bolt torque value

    6. In a random alternating pattern, tighten all bolts to approximately 75% of the specified bolt torque value.

    7. In a random alternating pattern, tighten all bolts until all the heads of the bolts shear off.

    8. Prior to bolt tightening, the serrated rails MUST remain aligned in the same position as they were manufactured. If they are damaged or knocked out of alignment while positioning, installation MUST cease and a new coupler used.

    9. Bolt tightening MUST be done in a random alternating pattern similar to tightening the lug nuts on an automobile wheel.

    10. A high quality 1" pneumatic drive impact wrench,with at least 100 psig air flow and 185 CFM of delivered air through a no less than 0.75" hose MUST be used for installation.

    Clink link below for Product Data

    d250xlbarlock_tds.pdf