Related Items:

New!
Dayton Superior D250 S/CA #3/#4 Bar Lock Rebar Coupler

Dayton Superior D250 S/CA #3/#4 Bar Lock Rebar Coupler

Price: CALL

Dayton Superior D250 S/CA #5 Bar Lock Rebar Coupler

Dayton Superior D250 S/CA #5 Bar Lock Rebar Coupler

Price: CALL

Item #: D250L-9
Availability: Stock
Usually ships In 2-5 Business Days

Dayton Superior D250L Long Series Bar Lock for #9 Rebar

  • Min. Fy %: 160
  • Outside Diameter: 2.9"
  • Length: 11.5"
  • Bolt quantity: 8
  • Head Size: .75"
  • Nominal Shear Torque: 350 ft. lbs.
  • Meets/Exceeds: Type 1, Type 2 requirements
  • Approvals: Caltrans, Army Corp of Engineers, State DOT's, AASHTO, City of Los Angeles, Ministries of Transportation Canada
Price: CALL

    Quantity:

    Image result for dayton superior

    The D250L Bar Lock L-Series Coupler is similar to the Standard Coupler but is designed for use when higher loads are required, such as extreme tension/compression application and/or seismic loading conditions. L-Series couplers are available in rebar sizes #4 through #14 and exceed 160% of specified yield of Grade 60 rebar. L-Series couplers are approved for use by most state DOTs, are recognized as an ICC Type 2 seismic splice, and meet ACT specifications. L-Series couplers are also available in transition sizes, weldable half couplers and epoxy coated

    INSTALLATION

    1. Insert the end of the first rebar halfway into the

    coupler until it contacts the center stop pin.

    2. Holding the first rebar in place, tighten all the bolts

    on that half until they are hand tight against the rebar.

    3. Insert the end of the second rebar halfway into the

    coupler until it contacts the center stop pin.

    4. Holding the second rebar in place, tighten all the

    bolts on that half until they are hand tight against the

    rebar.

    5. In a random alternating pattern, tighten all bolts to

    approximately 50% of the specified bolt torque value

    6. In a random alternating pattern, tighten all bolts to

    approximately 75% of the specified bolt torque value.

    7. In a random alternating pattern, tighten all bolts until

    all the heads of the bolts shear off.

    8. Prior to bolt tightening, the serrated rails MUST

    remain aligned in the same position as they were

    manufactured. If they are damaged or knocked out of

    alignment while positioning, installation MUST cease

    and a new coupler used.

    9. Bolt tightening MUST be done in a random

    alternating pattern similar to tightening the lug nuts

    on an automobile wheel.

    10. A high quality 1? pneumatic drive impact wrench,

    with at least 100 psig air flow and 185 CFM of

    delivered air through a no less than 0.75? hose

    MUST be used for installation.